The walls are concrete tilt up slabs poured into forms on top of the foundation.
Schindler house concrete walls.
Floor plan of the schindler house including gardens.
Interior walls are redwood and plaster.
Schindler and chace learned the process of tilt slab construction for irving gill.
Lots of fireplaces but no central heating system.
As the walls of concrete protect and defend schindler s walls of glass open one s world to the environment.
The house is built on a flat concrete slab which is both the foundation and the final floor.
The walls too are concrete with unadorned slabs separated by tiny strips of opaque glass rather than windows.
In between each panel was an insert of 3 inch wide glass that would let in light.
The walls are concrete tilt up slabs poured into forms on top of the foundation.
The lower floor is built of concrete using schindler s slab cast system.
Schindler was intrigued by new construction methods.
The tilt up slabs are separated by 3 inches 76 mm filled with concrete clear glass or frosted glass.
Tapered modular concrete wall slabs were poured on the floor slab and then tilted into the vertical position.
This process was also used in many projects like the dodge house and la jolla woman s club.
The modern dwelling will be a quiet flexible background for a harmonious life.
Massive blank walls are relieved by narrow slits of glass between the panels.
The tilt up slabs are separated by 3 inches 76 mm filled with concrete clear glass or frosted glass.
The house was the first residence constructed with tilt slab concrete walls.
Space climate light mood within its confines schindler wrote in his1912 manifesto in vienna.
Whereas gill had prefabricated entire walls schindler used a system of four foot long 1 2 meter units theoretically allowing them to be tilted into position by two men without the use of a.
The effect is strongly reminiscent of traditional japanese architecture with its simple modular plans and rustic elegance.
Using a consistent four foot module and standardized slab tilt wall construction schindler created a building in which no two spaces are alike while at the same time seamlessly integrating indoors and out creating in his words a real california scheme.
With this system concrete is poured one day the forms are lifted up the next day and another band of concrete is poured.
To balance the industrial chill of cement redwood framing of roofs and windows provides natural warmth.
For summers there was an open air sleeping roof.